Various tests are performed intermittently throughout the project construction, as to ensure that the Contractor doesn't keep installing an assembly that may not pass a water test, adhesion test, sizzle test, etc. When tests fail, it gives the Contractor the opportunity to find the root of the problem and adjust before the building is completed and turned over to the Owner.